How underfloor heating is installed: wet pipe in screed vs dry overlay panels
How underfloor heating is installed depends first on the floor. Where a floor is being built new, the water pipe can be clipped to insulation and screeded over; where you are keeping the floor, it can be pressed into grooved panels laid on top. The photos show both from underneath, before anything covers the pipe, and come from two jobs, a wet system in an extension and a dry system in an existing house. Plenty of guides use "dry" for electric heating mats, but here it means the panel system, with water in the pipe and no screed. This article stops at the pipe in the floor; beyond it, where the feed pipes go and what heats the water are a job for our plumbers.
Wet system: pipe clipped to insulation, waiting for the screed

In the extension the pipe is clipped straight onto foil-faced insulation boards in loops and wide bends, because in a wet system it is the screed laid over it that locks the pipe in place and spreads its heat across the floor. We laid the pipe in a row of U-shaped loops at the far end, with sweeping bends coming in from the right, and loose clips are still lying on the board. Heat leaves a pipe downwards as readily as upwards, and the board below holds back that downward share, so the heat goes up into the room.
This is the system for a floor that is being made from nothing anyway, such as an extension or a room where the floor has been dug out. Once the screed goes down the pipe is out of reach for good, so before that happens walk the layout for any pipe that has lifted off its clips or been trodden flat, and have the circuits tested while the pipe is still in view. Check too that an edge strip runs round the walls, so the screed has room to expand as it warms. Once the screed has dried out it behaves as a solid floor, and the finish on top is chosen much as you would choose laminate on a solid floor, with the extra check that it is suitable for underfloor heating.
Dry system: grooved panels set the pipe route

In the existing house grooved, foil-faced overlay panels run across the room and a white end panel carries ready-formed curved grooves for the return bends, so in a dry system the panels, not clips, decide where the pipe runs. The empty curves on the end panel show the path the pipe is given before it goes in, so a straight run can turn back without anyone shaping the bend by hand.
With no screed around the pipe, the foil facing spreads heat sideways from the groove across the face of the panel. The groove itself holds the pipe, so the build-up stays shallow and the floor you already have does not need breaking out. What goes over the panels has to suit heating and bridge the grooves without flexing, and for tiles you need a rigid layer on top first; an uncoupling mat alone takes up small movement but does not stiffen what lies beneath, as set out in tiling over an uncoupling mat.
Hallways: long straight runs and feed pipes along the wall

Down the narrow hallway the pipe sits in long straight grooves while a band of feed pipes runs together along one wall, because keeping the feeds in one channel at the edge leaves the rest of the floor free for the heating runs. We pressed the pipe into several parallel grooves heading away down the hallway, and the grouped feeds travel in a white panel beside the left-hand wall.
A corridor this narrow gives a loop very little room to turn back on itself, so straight runs suit the shape. Feed pipes carry water between the manifold and the heating circuits, and if they wandered they would cross the heating runs, which would lift pipes out of their grooves and make a hot spot where they meet. If your layout sends the feeds through a hallway, settle their route before the first panel goes down.
Doorways: where the feed pipes pass together

At the doorway the grouped feed pipes turn through a white routing panel with a groove for each pipe, because a door opening is the one gap the circuits beyond it have to share. The bundle turns at a right angle at the corner of the opening and each pipe stays in its own groove through the turn, while in the room beyond we laid the pipe in S-shaped loops.
Pipes that cross in a tight spot can be squashed under the floor finish, and a crushed pipe starves its circuit. A cluster of pipes also gives off heat where it lies whether the room needs it or not, so a doorway carrying a lot of feeds can end up warmer than the floor either side. The routing panel answers the first problem by keeping the pipes apart and flat. For the second, if a large group passes through one opening, ask whether the feeds will be sleeved or spread out so their heat reaches the rooms they are meant for.
Return bends: the panel shape does the turning

By the wall the pipe turns back on itself in U-shaped bends that sit in pre-formed curves in the panel, because a pipe forced into a tighter turn than it wants can kink and restrict the flow. We laid the pipe into the half-round recesses of the foil panels, and a connecting pipe runs in a cross groove along the wall edge.
The curve moulded into the panel holds the turn at a radius the pipe can take. Once the floor finish goes down a kinked bend is hidden, and what you notice is a cold patch or a circuit that will not warm up properly. Look along the bends by the walls before anything covers them, and ask for any bend that looks pinched to be relaid before the circuits are tested and covered.
Working around something set into the floor

Where a box is set into the panel the pipe is eased out of its groove and taken round it in a gentle curve, because a fixed obstruction in a dry system cannot be moved and the pipe can only bend so far. Beside the door frame the other runs stay straight in their grooves, and the one diverted pipe rejoins its groove once past the box.
The grooves follow a regular pattern and take no account of what else goes into the floor. At an obstruction the route is shaped by hand, with the same respect for the bend radius as at a wall. Before the panels go down, mark anything that will be set into the floor or fixed through it, and keep pipe out from under fitted units, where the heat is trapped and a screw for a plinth or a leg could find a pipe.
If you are weighing up screed against panels, start with whether your floor is being built from scratch or staying where it is. The pipework beyond the floor is part of our underfloor heating and plumbing work.
Questions about underfloor heating installation
Do I need insulation under underfloor heating?
Yes, in a wet system the pipe goes on an insulation layer, as it does on the foil-faced boards in our extension photos, because without it a large share of the heat soaks down into the slab and is lost to the room. How thick that layer should be depends on what lies below, and a ground-floor slab generally wants more than a timber floor over a heated room, so have whoever designs the layout size it for your floor. With overlay panels, ask how much the panel itself insulates and whether the floor below needs more.
How much does underfloor heating raise floor levels?
It depends on the system, with a screeded floor adding the most height and overlay panels much less, so check before choosing how the raised level will meet your door linings and thresholds. Add the finish to the panel or screed depth, because the tiles or boards and whatever sits under them set the final step, and doors may need trimming at the bottom to clear it.
Can underfloor heating be retrofitted?
Often yes, because a dry overlay system lies on top of the existing floor in grooved panels, so nothing has to be dug out, as long as the floor underneath is sound and flat enough to take them. A room that loses heat quickly, through a draughty timber floor or a wide stretch of glazing, is the one to check first, since a shallow overlay can only give out so much warmth and a heat-loss calculation for that room shows whether it will be enough.